Documents – Document Sources

DeSCRIPTIONLINKFile Name
UPLANDS WIND PRE-APPLICATION NOTICE. Basic outline of Pattern Energy”s 600 MW wind proposal in Grant, Iowa and Lafayette counties including preliminary infrastructure map. Filed with PSCW, Sept. 27, 2023. https://bit.ly/Uplands-PreApphttps://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=480525
BADGER HOLLOW WIND ENGINEERING PLAN. Basic outline of Invenergy’s 100+ MW wind power plant proposal in Grant and Iowa counties including preliminary infrastructure map. Filed with PSCW, May 20, 2024.https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=502198
APPLICATION FILING REQUIREMENTS FOR
WIND ENERGY PROJECTS IN WISCONSIN.
The outline used by the developer in making application for a wind power plant greater than 100 MW.
https://psc.wi.gov/Documents/AFR/AFR_WindGeneration.pdf
RICHARD JINKINS’ GOOGLE DRIVE RESOURCE – Numerous, health-related documents, studies, testimonial videos and maps .https://bit.ly/m/WindTurbineHealth
2024 WI WIND SITING COUNCIL MINORITY REPORT.   PDF Pages 67-112, Appendix E, “2024 ESC Report to Wisconsin Legislators. https://apps.psc.wi.gov/pages/viewdoc.htm?docid=502752https://drive.google.com/file/d/1rvhBR7D0BHpzrRIrTK7rUABn-V9gqoK1/view?usp=drive_link
EFFECTS OF LAND-BASED WIND TURBINE UPSIZING ON COMMUNITY SOUND LEVELS AND POWER AND ENERGY DENSITY. Study sponsored by US Department of Energy that finds an average setback distance of 4,560 feet for wind turbines of the height and power proposed for Livingston WI. Study was rejected for consideration by 2024 Wisconsin Wind Siting Council which left WI’s 2011 standard of 1250 feet in tact.https://bit.ly/4560fthttps://eta-publications.lbl.gov/sites/default/files/hoen_darlow_et_al_2023_effects_of_land-based_wind_turbine_upsizing_on_community_sound_levels_power_and_density.pdf